Construction Services / Design-Build Projects


Elevators in Building 9

This project involved modernizing two passenger traction elevators in two separate hoistways, for a total of four elevators in Building 9 at Walter Reed National Military Medical Center (WRNMMC) in Bethesda MD. The Scope of work included the demolition of elevator landings / lobbies and existing Fan Coil Units and the installation of mini split, HVAC units, in mechanical rooms to maintain cooling/heating levels for elevator controllers and equipment. This project also involved installation of two new sump pumps along with the required piping and associated set lines, ductwork modifications, and installation of fire and motorized dampers. In addition, new thermostats and control wiring were installed.

Upon completion these new elevators will support the hospital staff at WRNMMC.

Joint Base Myer-Henderson Hall – Chiller Repair and Replacement

SDC was responsible for design, acquisition, and replacement of three new chillers which provide cooling for thermal comfort of buildings 241 and 242, at Fort Myer, VA. Two 160-ton and one 60-ton air cooled chillers with low ambient operation were installed along with all associated piping, automatic feed system tank piping and isolation valves. Chillers were calibrated and inspected before being brought online.

The Long Barracks

Location: Fort Sam Houston, Texas

Client: Army COE

Design Build Team:

SDC Inc. Architects

RKJ Construction Inc.

Building 2000 & 2001

Location: Fort Sam Houston, Texas

Client: Army COC

User: IMCOM Regional

Design Build Team:

SDC Inc. Architects

RKJ Construction Inc.

Building 2270 Fort Sam Theater

Location: Fort Sam Houston, Texas

Client: Army COE

User: Army Entertainment

Design Build Team:

SDC Inc. Architects

RKJ Construction Inc.

Building 248 Pavilion

Location: Fort Sam Houston, Texas

Client: Army COE

User: 502nd ABW JBHQ

Design Build Team:

SDC Inc. Architects

Tidewater Inc

Community Living Center

Location: Temple, Texas

Client: Veterans Administration

User: Veterans Administration

Design Build Team:

SDC Inc. Architects

RKJ Construction Inc.

Comstock Border Patrol Station

Location: Comstock, Texas

Client: Army COE

User: US Border Patrol

Design Build Team:

SDC Inc. Architects
RKJ Construction Inc.

Galveston Opera House

Location: Galveston, Texas

Tidewater, Inc. Headquarters

Location: Elkridge, Maryland

Walter Reed Navy Medical Center

Location: Bethesda, Maryland
This project involved replacing generators in building 16.

Walter Reed Navy Medical Center

Location: Bethesda, Maryland
This project consisted of installing and energizing two uninterrupted power supply (UPS) units at building 9 at the Walter Reed Navy Medical Center.

Naval Research Laboratory

Location: Washington, DC
This project involved the phased demolition of existing and provision of 5 new Air Handling Units (AHUs) and 34 Fan Coil Units (FCUs).

Walter Reed Navy Medical Center

Location: Bethesda, Maryland
This project involved the renovation and repair to four traction elevators in building 9.

Walter Reed Navy Medical Center

Location: Bethesda, Maryland
This work included multiple boiler repair replacement projects.

US Army – 63rd Readiness Division (RD) – MAID-IQ for Region 4 for the State of CA

Location: California
Client: Department of Defense

US Army – 63rd Readiness Division (RD) – MAID-IQ for Region 3 for the States of AZ, NM & NV

Location: Arizona, New Mexico, and Nevada
Client: Department of Defense