Aberdeen Proving Grounds Boiler ReplacementOur Projects
SDC, through our joint venture with Tidewater (TI-SDC) was tasked with the complete rebuild of Cleaver Brooks Model DL-85-LH industrial boiler. TI-SDC dismantled the Burner assembly and the gas train as well as, removed inner and outer casing of boiler, removed inner insulation of boiler, removed drum seals, knee wall, front and rear wall of boiler. TI-SDC is replacing all refractory, tubes, and the steel drum inside the boiler.
- Business type
- Construction Projects and Clients
- Project
- Aberdeen Proving Grounds Boiler Replacement