Joint Base Myer-Henderson Hall Chiller Replacement

Title:

Description:

Joint Base Myer-Henderson Hall Chiller ReplacementOur Projects

Through a project managed for the government by USACE Huntsville, SDC was responsible for design, acquisition, and installation of three new chillers for buildings 241 and 242 at Fort Myer, VA. The existing chillers were removed and two 160-ton and one 60-ton air cooled chillers with low ambient operation were installed along with all associated piping, automatic feed system tank piping and isolation valves. Chillers were calibrated and inspected before being brought online.
Business type
Construction Projects and Clients
Project
Joint Base Myer-Henderson Hall Chiller Replacement
Location
Fort Myer, VA

About Us

SDC, founded in 1989 originally specialized in preservation and architecture in San Antonio, Texas, but has grown and expanded to provide comprehensive environmental, construction and facilities management support throughout the world.

NAISC codes

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.