Through a project managed for the government by USACE Huntsville, SDC was responsible for design, acquisition, and installation of three new chillers for buildings 241 and 242 at Fort Myer, VA. The existing chillers were removed and two 160-ton and one 60-ton air cooled chillers with low ambient operation were installed along with all associated piping, automatic feed system tank piping and isolation valves. Chillers were calibrated and inspected before being brought online.